An incomplete assembly RFQ costs more than the time it saves. It costs a round of questions, a revised quote, an engineering assumption made on your behalf, and sometimes a first article that fails because a detail was never specified. Most assembly quote revisions are caused by five missing items, not by price negotiation.
This checklist covers the twelve inputs a PCB assembly quotation needs, what each one changes, and how to send a package that gets quoted once. YC PCB quotes turnkey assembly daily, and this list is built from the packages that come back incomplete.
The Twelve Inputs
| # | Input | Without it |
|---|---|---|
| 1 | Gerber (RS-274X) | Board cannot be fabricated or priced |
| 2 | Excellon drill file | Hole count and sizes unknown; drill cost unpriced |
| 3 | Board outline and panelisation | Array and material utilisation unknown |
| 4 | BOM with MPNs | Component cost cannot be quoted; substitution becomes guesswork |
| 5 | CPL / centroid file | Placement count and machine programme unknown |
| 6 | Assembly drawing | Polarity and orientation left to assumption |
| 7 | Test specification | "Test" defaults to visual inspection |
| 8 | Quantity and build schedule | Setup amortisation and material booking unknown |
| 9 | Solder paste / process constraints | Stencil and reflow profile choices made blind |
| 10 | Component supply model | Turnkey versus consigned changes the entire cost structure |
| 11 | Conformal coating, programming, box build scope | Added later as a change order |
| 12 | Acceptance criteria and IPC class | Disputes at incoming inspection |
What Each Missing Item Actually Changes
The five that cause most revisions
No MPNs in the BOM. The quote becomes an estimate based on generic parts. The number you receive is not the number you will pay, because the actual parts may cost more or be unavailable.
No CPL. Placement count cannot be confirmed. A quote built on an assumed count is a placeholder, and the first revision usually goes up.
No assembly drawing. Orientation of diodes, LEDs, connectors and electrolytics becomes an assumption. It is a small file that prevents a whole class of defects.
No test spec. This is the most expensive omission. "AOI only" and "AOI + X-Ray + ICT + FCT" are wildly different scopes. Without a specification, the supplier quotes the cheapest interpretation and you discover the gap at receiving.
No supply model stated. Full turnkey, partial turnkey and consigned produce three different prices for the same board. Saying "assembly quote please" leaves the supplier to choose.
No quantity or schedule. Setup, stencil, fixtures and component minimum order quantities all depend on volume. A quote for 10 pieces and a quote for 1,000 pieces are different documents.
No acceptance criteria. If IPC Class 2 versus Class 3 is not stated, the supplier will apply their default. For high-reliability products, that is a specification gap, not a cost saving.
cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits
cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits.
| cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits | cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits | cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits | cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits |
|---|---|---|---|
| cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits | cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits | cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits | Supplier guess, on your behalf |
| CPL / centroid | Placement count assumed | Programme wrong; rotation errors at first article | Nobody — it becomes a first-article failure |
| Assembly drawing | No direct cost | Polarity and orientation assumed; rework or scrap | Assembly operator's judgement |
| Test specification | Lower price, narrower scope | Defects reach you; disputes at receiving | Supplier's cheapest interpretation |
| Supply model | Three different prices for one board | Component ownership disputes | Supplier chooses for you |
| Quantity and schedule | Setup amortisation unknown | Material booked late; date moves | Supplier's default batch size |
| Acceptance criteria | No effect | Class disagreement at incoming inspection | Supplier's own standard |
| Coating / programming / box build | Excluded, so the quote looks cheap | Change order, new lead time, re-qualification | Change order, at your cost |
The pattern: cheap quotes are usually not cheap, they are narrow. The items that get left out are exactly the items that cost money to include.
Why Assembly Quotes Differ So Much
Four legitimate reasons and two that should make you ask questions.
Legitimate:
- Component sourcing route — authorised distributor versus broker; the price and the risk both differ
- cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits — the largest single swing between quotes on the same BOM
- Setup amortisation — stencil, fixtures and programming spread across the order quantity
- Process capability — a supplier set up for fine-pitch BGA work prices that work differently from one that is not
Ask questions when you see:
- A quote with no BOM cost breakdown on a turnkey order. You cannot compare what you cannot see.
- A quote significantly below the component cost of the BOM itself. cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits.
cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits
cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits. cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits.
cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits. cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits.
cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits. cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits.
cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits. Programming, coating, box build, labelling, serialisation, packaging. Each one is a line item, and each one is cheaper to define now.
Scope Items Buyers Forget
Eight lines that appear as change orders
- IC programming — who owns the firmware file, who owns the programming fixture, is it programmed before or after assembly
- Conformal coating — masking requirements, coating type, cure, inspection, rework implications
- Box build — mechanical assembly, cabling, final test, packaging
- Serialisation and labelling — format, placement, database
- Moisture-sensitive parts — bake and floor-life handling
- ESD packaging — tray, tube, tape-and-reel, moisture barrier
- Excess material — returned, scrapped, or held for the next order
- Rework policy — who pays when a defect is found, and at what stage
Where Quotes Get Held Up
BOM/CPL reference mismatch. The review stops until the discrepancy is resolved.
Missing MPN on a long-lead part. The supplier cannot check availability, so the schedule cannot be committed.
Unclear board count per panel. Assembly is priced per board, materials per panel. If the array is undefined, both numbers move.
Ambiguous double-sided assembly. Two passes change machine time and reflow count. If the CPL only lists the top side, the quote covers the top side.
Test requirement described in words. "Full test" means different things. Write the pass criteria.
Checklist Before You Hit Send
- One archive, one revision, clearly named.
- Gerber and drill from the same export, same origin.
- BOM with MPN and manufacturer on every line; DNP and variants flagged.
- CPL with units and origin stated; both sides if double-sided.
- [ ] Assembly drawing with pin-1 markers on polarised parts
- Test specification with method and pass criteria.
- Supply model stated: full turnkey, partial, or consigned (with the split listed).
- Quantity, annual volume and target date.
- Scope for programming, coating, box build, labelling, packaging.
- Acceptance criteria: IPC class, cosmetic standard, rework policy.
- Any part that must not be substituted, flagged explicitly.
- cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits.
Veelgestelde vragen
cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits
cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits.
cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits
cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits.
cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits
cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits.
What slows an assembly quote down most?
BOM and CPL mismatches, and missing MPNs on long-lead parts. Both stop the review because neither can be resolved by the supplier alone. A five-minute check on your side — reference designators matching, every line has an MPN — typically saves several days.
Why YC PCB
- cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits
- Turnkey assembly with in-house BOM management and component sourcing; consigned and partial models accepted
- SMT, THT/DIP, mixed technology, BGA/QFN/Micro-BGA with X-Ray inspection
- AOI, electrical test, ICT and FCT scoped per project; IC programming and box build available
- DFM/DFA review before production, with a BOM/CPL/Gerber consistency check
- ISO 9001 and UL certification; NDA available for customer IP
- No MOQ / No MOV on standard boards, quoted per project for special materials
Get a Quote — Send your Gerber, BOM, CPL, assembly drawing and test requirement in one archive, with quantity and target date. Our engineers reply with a consistency check, DFM notes and pricing within one working day.